PORTFOLIO
Director Esbagambetov M.K.
Head of the section of metal Kzylbasov Dulat.
Metalwork assembler Seydullaev Daulet
Installation of metal structures
Preparation of metal construction suports
Brigade Mukhtarov Temur.
Installers metalwork.
Supervisor of ProfileSpetsStroy LLP: Kyzylbasov Arman
Preparation of pipeline lines 3110 for welding.
Pipe installers: Ruslan Tlenshiev, Tlekkabyl Gusmanov, Bauyrzhan Doszhanov.
Engineer TB and OT LLP "ProfileSpetsStroy": Khairullin Dinislam
Pipe installation team: Olzhas Saydaliyeva and metalwork fitters: Temur Mukhtarov.
Welding works: Argon-arc welder: Serdi Abdirov
Working moments Pipe fitting supervisor: Saydaliyev Olzhas, Koyshiev Meirambek
Bypassing the representatives of the customer KazStroyServiz LLP.
Discussion of working moments with representatives of the customer.
Workshop pipe builders
Container office on the site.
Supervisor Amenov Aibek for the working moment.
Compressor station SKS-7 VP:
Electrician Molodozhenov Alexander for installing switches and sockets in the dining room of the shift camp SKS-7.
Supervisor: Adilkhanov Aslan Brigade of electromotive and instrumentation and automation equipment:
Instrumentation Brigade: Senior Instrumentation and Instrumentation Engineer Kulov Amangeldy
Instrumentation technology: Marasulov Akbar and Ibragimov Zariffula
Electricians: Abdushev Mereke and Nyshanov laying the grounding around the perimeter in the pump SKS-7
Chinarev oil and gas condensate field
Construction of buildings and office of the hotel "Talan Towers"
Airless paint spraying
Compressor station
Construction of apartment buildings in the city of Atyrau "Tonykok Kurylys" LLP,
improvement and asphalting of adjacent territories.
Project KTK pipeline system. Correction.
Construction of a new A-PPS-3A, Atyrau region, Akystau
EXPO-2017, Astana, SK Bazis LLP
Project construction of VRU № 2 at the site of JSC "ArcelorMittal Temirtau» Temirtau, Karaganda region